Maintenance of a hydro-electric dam
Mission :
Maintenance operations of the hydro-electric dam at la Couesque (Aveyron) for EDF: changing the filter pipes upstream of the filling valves with a global solution proposed by RJTM including proposing technical solutions, taking measurements, pre-fabrication in our workshops, installation of the supports on site then acceptance testing by the customer within a given time (the dam was closed for 5 weeks).
Industry type :
Energy